<-- back to areas of expertise
Brightwater Pipeline EIS - King County, WA
Project Details
- Conceptual structural design of submarine outfall pipeline on four sites and along five alignments.
- Study of pipe jointing, sheeting and shoring, pipe installation methods – segmental lay, control floatation and bottom pull, and access shafts for TBM option.
- Preliminary (30% level) engineering design for 60" diameter steel and HDPE alternate outfall pipeline, sheeting and shoring along a preferred alignment.
Featured Pipeline, Water and Wastewater Projects
- Portland International Airport Outfall - Portland, OR
- Redondo Outfall - Federal Way, WA
- Vista View Storm System Improvements - Tacoma, WA
- Gig Harbor Outfall - Gig Harbor, WA
- Denny Way/Lake Union CSO - Seattle, WA
- Brightwater Pipeline EIS - King County, WA
- Interbay Pump Station Phase 2 Upgrade - King County, WA
- Cle Elum WWTP - Cle Elum, WA
Other Pipeline, Water and Wastewater Projects
- University Audi - Storm Drainage System - Seattle, WA
- Boston Harbor Wastewater Treatment Plant - Thurston County, WA
- South Prairie Wastewater Treatment Plant - South Prairie, WA
- Coca-Cola Bottling Company - Chemical Building Waste Treatment - Bellevue, WA
- Shelton Wastewater Treatment Plant - Shelton, WA